Please ensure Javascript is enabled for purposes of website accessibility

Proiecte Europene

buton proiecte europene

Proiecte PNRR

buton pnrr

POIM 2014 - 2020

buton poim

EU4Business

eu4business

Iaz Batal

banner iazbatal fazare

Protecția consumatorilor

InfoCons

Serviciul de urgență 112

112 logo

Ziua informării preventive

ziua inform preventive

fiipregatit.ro

fiipregatit.ro

Events calendar:

<<  May 2020  >>
 Mo  Tu  We  Th  Fr  Sa  Su 
      1  2  3
  4  5  6  7  8  910
11121314151617
18192021222324
25262728293031
Urmatoarele evenimente:

No current events.

Bilete online

buton teatrul national

Salvați copiii

salvati-copiii-logo

Autoritatea Națională Turism

banner aut nat.fw

SIS II

sis2 

Wikipedia:

wikipedia


 

1.      NATIONAL COLLEGE „ALEXANDRU PAPIU ILARIAN”

1. PROJECT’S PRESENTATION

The project’s general objective is the improvement of education infrastructure’s quality and the endowment of the schools in Tirgu-Mures, in order to ensure an educational process at European standards and to increase the participation of the students at the educational process.

The project’s specific objectives aim the maintenance and the improvement of National College “Papiu Ilarian” infrastructure, through its rehabilitation and modernization. Thus, the specific objectives are:

-  Improving infrastructure’s quality of the National College “Papiu Ilarian”- Tirgu Mures, until February, 2012;

-  Increasing the quality of endowments of the National College “ Papiu Ilarian”- Tirgu- Mures, until February, 2012;

The rehabilitation and modernization of the National College refers to renovation of the building, but also to the acquisition of endowments and technical equipments for laboratories and cabinets.

The accomplishment of the specific objectives will lead to the maintenance of the actual number of students at the National College “Papiu Ilarian”- Tirgu Mures, by offering an educational process at European standards.

Also, by achieving these objectives, it will be also accomplished the specific objective of the Priority Axis 3- “Improvement of the social infrastructure”, key area of intervention 3.4- “Rehabilitation, modernization, development and equipping of pre-university, university education and continuous vocational training infrastructure”, through:

-    Improvement of education infrastructure

The project will rehabilitate and modernize an important school unit, The National College “Papiu Ilarian”- Tirgu-Mures. This high school, in its entire existence, has provided over 12.000 graduates, of which about 7.700 to day classes, 3.346 to evening classes, and over 1.000 to part-time classes. The high school has always excelled at school contests (Olympics), not only at county level, but also at national and even international one. Thus, almost every year, about 20-25 students participated at national school contests. By order of the Ministry of National Education no. 3647 from 15.04.1999, the high school „Alexandru Papiu Ilarian" changed its name into “National College”.

Due to the rehabilitation and modernization of the College, the number of students will maintain, and the school abandon’ rate will be the same, meaning 0%.2.    PROJECT’S VALUE:

        The total value of the project is de:          12.651.795,69 lei  from which:

        Non-reimbursable financial assistance: 10.257.180,86 lei

        Co- financing: 374.580,22 lei

The difference of 2.020.034,61 lei  is represented by the VAT of the project’s total value.

3. FINANCING SOURCE: REGIONAL OPERATIONAL PROGRAMME 2007 – 2013, PRIORITY AXIS 3. “Improvement of the social infrastructure”, KEY AREA OF INTERVENTION 3.4 “Rehabilitation, modernization, development and equipping of pre-university, university education and continuous vocational training infrastructure”

Management Authority for Regional Operational Programme: MINISTRY OF REGIONAL DEVELOPMENT AND TOURISM

4. IMPLEMENTATION PERIOD: 16 months after signing the contract

5. IMPLEMENTATION RESPONSIBLE: THE SERVICE OF INTERNATIONAL FINANCING PROJECTS IN COLLABORATION WITH SCHOOLS DIRECTION

6. STAGE: - evaluation


2. SCHOOL „GHEORGHE ŞINCAI”
 

1. PROJECT’S PRESENTATION

The project’s general objective is the improvement of education infrastructure’s quality and the endowment of the schools in Tirgu-Mures, in order to ensure an educational process at European standards and to increase the participation of the students at the educational process.

The project’s specific objectives aim the improvement of School “Gheorghe Sincai” infrastructure, through its rehabilitation and modernization. Thus, the specific objectives are:

-  Improving infrastructure’s quality of the School “Gheorghe Sincai” Tirgu Mures, until the end of January, 2012;

-  Increasing the quality of endowments of the School “Gheorghe Sincai” Tirgu Mures, until the end of January, 2012;

The rehabilitation and modernization of the school refers to thermal rehabilitation of the building, but also to the acquisition of endowments and technical equipments for laboratories and cabinets.

The accomplishment of the specific objectives will lead to the maintenance of the actual number of students at the School “Gheorghe Sincai” - Tirgu Mures, by offering an educational process at European standards.

Also, by achieving these objectives, it will be also accomplished the specific objective of the Priority Axis 3- “Improvement of the social infrastructure”, key area of intervention 3.4- “Rehabilitation, modernization, development and equipping of pre-university, university education and continuous vocational training infrastructure”, through:

-    Improvement of education infrastructure

The project will rehabilitate and modernize an important school unit, School “Gheorghe Sincai” - Tirgu Mures. This is a vocational school (mechanics), formed and structured in high school, post high school and evening classes, all which are intended to serve social and cultural needs of the inhabitants of this city.

The School Gheorghe Şincai, built in 1976, has three different wings, as follows:

          - Wing A – the main body, the school itself- divided into 3 levels: the ground-floor +2 levels

          - Wing B – Gym and workshops – divided into 2 levels:  the ground-floor +1 level

          - Wing C – Workshops - divided into 2 levels:  the ground-floor +1 level

Due to the rehabilitation and modernization of the College, the number of students will maintain, and the school abandon’ rate will decrease or even disappear. (presently, the school abandon’ rate is 1,8%).

2.    PROJECT’S VALUE:

        The total value of the project is de:          9.551.084,01 lei  from which:

        Non-reimbursable financial assistance: 7.862.168,60 lei

        Co- financing: 163.952,42 lei

The difference of 1.524.962,99 lei is represented by the VAT of the project’s total value.

3. FINANCING SOURCE: REGIONAL OPERATIONAL PROGRAMME 2007 – 2013, PRIORITY AXIS 3. “Improvement of the social infrastructure”, KEY AREA OF INTERVENTION 3.4 “Rehabilitation, modernization, development and equipping of pre-university, university education and continuous vocational training infrastructure”

Management Authority for Regional Operational Programme: MINISTRY OF REGIONAL DEVELOPMENT AND TOURISM

4. IMPLEMENTATION PERIOD: 15 months after signing the contract

5. IMPLEMENTATION RESPONSIBLE: THE SERVICE OF INTERNATIONAL FINANCING PROJECTS IN COLLABORATION WITH SCHOOLS DIRECTION

6. STAGE: - evaluation


3. „DACIA” GYMNASIUM

 

1. PROJECT’S PRESENTATION

The project’s general objective is the improvement of education infrastructure’s quality and the endowment of the schools in Tirgu-Mures, in order to ensure an educational process at European standards and to increase the participation of the students at the educational process.

The specific objectives refer to the improvement and infrastructure extension of the Dacia Gymnasium Wings, A and B, from Tirgu Mures, through rehabilitation, modernization and mansard- roofing. Thus, the specific objectives are:

-  Improving infrastructure’s quality of the Dacia Gymnasium, Wing A, Tirgu Mures, until March, 2012;

-  Improving infrastructure’s quality of the Dacia Gymnasium, Wing B, Tirgu Mures, until March, 2012;

-  The extension of Dacia Gymnasium, Wing A, Tirgu Mures, until March, 2012;

-  The extension of Dacia Gymnasium, Wing B, Tirgu Mures, until March, 2012;

-  Increasing the quality of endowments of the Dacia Gymnasium, Wing A, Tirgu Mures, until March, 2012;

-  Increasing the quality of endowments of the Dacia Gymnasium, Wing B, Tirgu Mures, until March, 2012;

The rehabilitation and modernization of the Dacia Gymnasium’ buildings, wing A and B, refers to the renovation of the buildings, but also to the acquisition of endowments, technical equipments for laboratories and cabinets and IT equipments.

The extension of Wing A and B refers to mansard- roofing, in order to grow the Gymnasium’s capacity.

The accomplishment of the specific objectives will lead to the growth of the number of students at the Dacia Gymnasium” - Tirgu Mures, by extension of the two buildings and by offering an educational process at European standards.

Also, by achieving these objectives, it will be also accomplished the specific objective of the Priority Axis 3- “Improvement of the social infrastructure”, key area of intervention 3.4- “Rehabilitation, modernization, development and equipping of pre-university, university education and continuous vocational training infrastructure”, through:

-    Improvement of education infrastructure

The project will rehabilitate and modernize an important school unit, Dacia Gymnasium - Tirgu Mures. This school has 2 wings: wing A, where students from primary school have their classes, and wing B- the gymnasium.

Due to the extension of the Dacia Gymnasium, the number of students will grow, and the school abandon’ rate will be the same, meaning 0%.

It is aimed that at the end of the project’s implementation (March 2012), due to the new classrooms resulted from the vertical extension (mansard- roofing), the number of students will grow as follows:

- Dacia Gymnasium, Wing A – 523 students and pre-school children, instead of 505

- Dacia Gymnasium, Wing B – 327 students and pre-school children, instead of 304

2.    PROJECT’S VALUE:

        The total value of the project is de:          11.307.445,21 lei  from which:

        Non-reimbursable financial assistance: 8.826.100,30 lei

         Co- financing                                         675.954,50 lei

The difference of 1.805.390,41 lei is represented by the VAT of the project’s total value.

3. FINANCING SOURCE: REGIONAL OPERATIONAL PROGRAMME 2007 – 2013, PRIORITY AXIS 3. “Improvement of the social infrastructure”, KEY AREA OF INTERVENTION 3.4 “Rehabilitation, modernization, development and equipping of pre-university, university education and continuous vocational training infrastructure”

Management Authority for Regional Operational Programme: MINISTRY OF REGIONAL DEVELOPMENT AND TOURISM

4. IMPLEMENTATION PERIOD: 17 months after signing the contract

5. IMPLEMENTATION RESPONSIBLE: THE SERVICE OF INTERNATIONAL FINANCING PROJECTS IN COLLABORATION WITH SCHOOLS DIRECTION

6. STAGE: - evaluation

 

Joomla Templates and Joomla Extensions by JoomlaVision.Com


Back

Alegeri2024

buton MOL

 

buton program transport local

buton program multianual sustinere familii

Grafic lunar colectare deseuri

buton spclep
buton weekend ro
seretirgumures
dastgmures ro
buton dfltgm
buton prog sitpf

Noutăți

BP
buton birou unic
buton parcare
buton prog acte identitate online
buton prog casatorii online2
buton prog transc online2
buton recomandari sezon estival
buton harta targu mures

Posturi vacante

buton posturi vacante

Projects. Strategies

BannerMyCity - EN3
banner_proiecte_en
Digital Mures
banner_oras_eco_en
banner_pug
banner_arh
 

Secțiune RUTI conform SNA

banner anticor.fw 

Social network:

FacebookTwitterYoutube

Vizitatori

Azi:1207
Ieri:1641
Săptămânal:5838
Lunar:34545
All5031972