1. PROJECT’S PRESENTATION:
General objective:
Improving the environment by creating green spaces in the city of Tirgu Mures.
Specific objectives:
Park rehabilitation in Carpaţi Alley;
Park rehabilitation in Haţeg Alley;
Park rehabilitation in Vrancea Alley

Results:
Carpaţi Alley no. 33-37
playground complex 3 towers, 2 slides, 1 swing
6 means of climbing and 2 means of climbing on cable                2 pieces
swing with two seats – 2/1,5 m                                                 2 pieces
rocking chair with four seats – 2/3 m                                         2 pieces
bench with three seats on metallic structure – 0,6/1,8 m            33 pieces
wooden bins on metallic structure                                            25 pieces
hexagonal wooden structure covered with wood-11,5/10m           1 piece
metallic lamp-posts with two arms-3,5m                                   15 pieces
wooden table on metallic structure- 1/1m                                   8 pieces
wooden pergola-4/1.3/2.5m                                                      3 pieces
sandbox-6.0/2.5m                                                                    1 piece
wooden gazebo- 4/4/2.5m                                                         4 pieces
The new space will be enclosed by decorative trees and on the lateral near the street will be planted a hedge along a length of 96 ml.

Vrancea Alley
- playground complex 3 towers, 2 slides, 1 swing
 8 means of climbing and 2 means of climbing on cable                
  4 access ramps for wheelchairs                                                1 piece
- swing with two seats -2/1,5m                                                   2 pieces
- rocking chair with four seats -2/3m                                           2 pieces
- bench with three seats on metallic structure -0,6/1,8m              20 pieces
- wooden bins on metallic structure                                            17 pieces
- metallic lamp-posts with two arms -3,5m                                   5 pieces
- sandbox -3,0/4,0m                                                                  1 piece
- wooden gazebo 4/4/2.5m                                                         3 pieces
- wooden pergola -4/1.3/2,5m                                                     3 pieces
- wooden table on metallic structure -1/1m                                   3 pieces 
The new space will be enclosed, according to the situation plan, by decorative trees, and the lateral near the street and the western  side will separate the space with a hedge.

Hateg Alley no.6-12
 - playground complex 3 towers, 2 slides, 1 swing
      6 means of climbing and 2 means of climbing on cable             1 piece
- swing with two seats -2/1,5m                                                     1 piece
- rocking chair with four seats -2/3m                                             1 piece
- bench with three seats on metallic structure -0,6/1,8m                 7 pieces
- wooden bins on metallic structure                                               6 pieces
- metallic lamp-posts with two arms -3,5m                                     3 pieces
- wooden table on metallic structure -1/1m                                    1 piece
- wooden pergola -4/1.3/2.5m                                                      2 pieces
- wooden gazebo -4/4/2.5m                                                         1 piece

2. PROJECT’S VALUE:
-         The total value of the project is:                 1.182.652 lei, from which:
-          Non-reimbursable financial assistance:       1.062.652 lei
-          Co- financing                                           120.000 lei 
3. FINANCING SOURCE: ENVIRONMET FUND ADMINISTRATION

4. DEADLINE: 12 months from the date of signing the financing contract
5. IMPLEMENTATION RESPONSIBLE: PROJECT IMPLEMENTED IN COLLABORATION WITH PUBLIC DOMAIN ADMINISTRATION
6. STAGE: signing the financing contract

 

Joomla Templates and Joomla Extensions by JoomlaVision.Com